COMMERCIAL PROJECTS
601 – 607 Milner Avenue
Delsan-AIM successfully decommissioned and demolished a large warehouse and adjoining office building near a 16-lane highway in Toronto, Ontario. The two-storey office building, with a 14,400 ft² footprint, featured reinforced concrete walls, foundations, and steel framing with precast concrete exterior panels.

The 256,700 ft² warehouse, connected to the office by a walkway, had reinforced concrete foundations, grade slabs, and precast framing for its second floor and roof, with exterior precast concrete panels.

April 2022 – February 2023
541 Kipling Avenue
The project involved the decommissioning and demolition of a 432,000 ft² single-storey warehouse (24.5 ft high) and a 2,300 ft² ancillary building (15 ft high). The warehouse, with some mezzanine floors, had a steel frame, metal deck roof supported by open-web steel joists, and precast panel exterior walls.

The ancillary building featured precast framing and a precast roofing system. A nearby railway spur line north of the buildings was protected during demolition.

February 2022 – November 2022
94 Cumberland Street
Delsan-AIM decommissioned and demolished a nine-storey, 10,530 ft² office building in Yorkville, Toronto, built in the late 1960s with a reinforced concrete structure, precast panel façade, and two-level basement. The urban location required innovative solutions to ensure safety and minimize disruptions.

April 2020 – August 2022