London Psychiatric Hospital Delsan-AIM successfully undertook the decommissioning and demolition of eight buildings at the London Psychiatric Hospital, covering an area of over 130,000 square feet. The project required meticulous planning to address hazardous materials and ensure sustainable practices while adhering to engineered safety guidelines and regulatory compliance. February 2022 – January 2023 |
Nanticoke Generating Station Delsan-AIM managed the safe decommissioning and demolition of the Nanticoke Generating Station for Ontario Power Generation. Once North America’s largest coal-fired facility, the 4,000 MW station, built between 1967 and 1978, was decommissioned in 2013. The multi-year project prioritized safety and regulatory compliance at every stage. 2017 |
Olympic Stadium Delsan-AIM was tasked with removing precast panels and glazing from the Olympic Stadium Tower in Montreal, Quebec, over a six-month period. The project was a critical step in the comprehensive renovation of the iconic structure, the tallest inclined tower in the world at 541 feet. October 2016 – April 2017 |
Oakville Trafalgar Hospital Delsan-AIM was contracted by the Town of Oakville to undertake the decommissioning and demolition of the former Oakville Trafalgar Hospital complex, including the main hospital building and a secondary office structure. Given the site’s proximity to a residential community, careful planning and execution were critical to ensuring public safety and compliance with local regulations 2017 |
Mirabel Airport Delsan-AIM was contracted by Aéroports de Montréal (ADM) to manage the complete decommissioning and dismantling of the former Mirabel Airport, located north of Montréal. As the general contractor, Delsan-AIM coordinated with multiple trades to prepare for demolition, including the disconnection, relocation, and capping of electrical, mechanical, and communication services. 2014 |